Your NYC condo remodel consists of a complex web of design choices, board approvals, and permits. The good news is, with the right preparation and a solid plan, your condo remodel can be stress-free. Here, we’ll cover the steps needed to help your condo remodel project go smoothly.
Know Your Building’s Rules First
Before you start dreaming about that open-concept kitchen, you need to understand your building’s renovation policies. Every condominium and co-op board has specific policies regarding working hours, structural changes, and noise levels.
Take the building’s alteration agreement and inspect it thoroughly. It is common for buildings to have renovation policies that restrict certain changes, such as relocating plumbing or load-bearing walls. Boards take 4 to 8 weeks before giving approval, so factor this into your project timeline. Starting demolition without board approval will be a very costly mistake that you will regret.
Assemble Your Dream Team
The success of your condo remodel hinges on enlisting the right experts. This is who you’ll need:
- A licensed contractor with NYC experience: They will handle building codes and Department of Buildings requirements
- An architect or designer (for structural changes): This is a must for walls, plumbing, and electrical work
- An expediter: Someone who specializes in securing permits and can save you weeks of headaches
Don’t go for the lowest bid. Check references, verify licenses, and ensure they’re insured. A rough budget for a contractor in NYC is $200-400 per square foot for mid-tier finishes, and $500+ per square foot for luxury finishes.
Secure Your Permits and Insurance
When it comes to renovations, permits are a must. If your renovations are more than just cosmetic changes, you will need a permit from the NYC Department of Buildings. Ideally, your contractor will take care of this, but you will need to provide:
- Certificate of insurance naming the building as additionally insured
- Architect’s drawings (for structural work)
- Completed permit applications
The permit process typically takes 3-6 weeks. Meanwhile, arrange for additional liability insurance to protect yourself and your neighbors during construction.