Looking at your outdated-looking bathroom and thinking it’s time for a change? Well, you are not alone. But before picking tile patterns and fantasizing about rain-fall showerheads, consider how long the bathroom renovation will take. Let’s break down the timeline so you can plan accordingly with no surprises or extended stays at your in-laws.

Real Timeline: What to Expect

How long does a bathroom renovation take from start to finish? Most bathroom renovations take from six weeks to three months, with the actual construction phase averaging about twenty to thirty working days. That’s the honest answer, but when your bathroom is undergoing construction, time is just a piece of the puzzle.

Think about the renovations like an iceberg. The visible part in the construction phase, with hammers swinging and getting tiles set, is dramatic but brief. Underwater is where most of the timeline resides. Things like pre-construction planning, waiting for permits to be approved, and sourcing materials can take longer than the renovation itself.

Pre-Construction Phase

Before a single tile is removed from your wall, you will have to navigate what the contractors call the “paper phase.” This is the phase where things are most likely to sail smoothly or hit unexpected delays.

Permits and Approvals (2 Weeks to 3 Months)

If you are moving plumbing lines, changing the electrical wiring, or touching gas lines, you will need City Permits and possibly Board Approvals. Some homeowners get this process done in 2 weeks, while others wait months.

Key factors affecting permit timelines:

  • Stand-alone houses: Skip board drama but need city permits for code compliance
  • Condos/co-ops: Board architectural reviews can add significant time
  • Scope complexity: Moving gas lines requires inspector sign-offs before closing walls

Finding Your Contractor (2-4 Weeks)

Schedule site visits with at least three contractors, review portfolios, check references, and compare detailed bids. A week spent choosing the right team saves months of headaches.

Material Selection (Varies Widely)

That gorgeous Italian tile? It might have a 12-week lead time. Order materials the moment your design plan is finalized. Many projects stall because homeowners underestimate how long custom vanities or specialty fixtures take to arrive.

background image

Construction Phase: When Things Get Real

The construction phase typically breaks down like this:

Week 1: Demo and Rough Work

  • Demolition (4-6 hours)
  • Rough plumbing and electrical work
  • Initial inspections if required

Weeks 2-3: Core Installation

  • Drywall repairs and priming
  • Floor tile installation
  • Shower/tub installation
  • Vanity and cabinetry

Weeks 3-4: Finishing Touches

  • Wall tile and backsplashes
  • Fixture installation
  • Hardware and final inspections

What Drives Up the Timeline?

Some renovations breeze through in five weeks; others drag on for four months. Timeline extenders include:

  • Moving plumbing or electrical systems
  • Custom materials with long lead times
  • Structural surprises like water damage
  • Board approval processes
  • Backordered fixtures

Timeline shortcuts include keeping existing layouts, choosing in-stock materials, working in single-family homes, and having detailed design plans finalized.

Budget Reality Check

Most bathroom renovations range from $10,000 for basic refreshes to $35,000+ for high-end remodels. Mid-range renovations typically cost $15,000-$25,000. Your timeline and budget are connected—rushing often costs more, while thorough planning saves money.

The Finish Line

The punch list phase addresses final details—cabinet adjustments, grout touch-ups, or late-arriving fixtures. This takes 1-5 days, though backordered items can extend this phase. Test every drawer, examine grout lines, and run all faucets during your final walkthrough.

Your Next Move

Planning a bathroom renovation doesn’t have to feel overwhelming. With the right contractor and realistic timeline expectations, you’ll be soaking in your new tub before you know it. At Zicklin Contracting, we’ve perfected the art of keeping bathroom renovations on schedule without cutting corners.

Let’s turn that outdated bathroom into your personal spa retreat—on time and on budget. Visit zicklincontracting.com to schedule your consultation and get a detailed timeline customized for your project. 

background image
OUR TRUSTED BRANDS
Metroloft Logo
Housing Authority Logo
Housing Development Logo
NACA Logo
Santana Logo
Altra Logo
Logo
Logo
Contact us

Reach out to us

Call us
Call our team Mon-Fri 8am to 5pm.
Email us
Call our team Mon-Fri 8am to 5pm.






    Waterproofing Queens | Checked Box Icon - zicklincontracting.com | Waterproofing Queens | Zicklin Contracting | Home Renovation

    Thank You!

    Your message was successfully submitted.

    We will contact you as soon as possible.

    Background Image

    Ready to work together?

    It’s time to create your dream home in the “city that never sleeps”




    99 Wall St Suite 172, New York

    Available 24/7 for Emergency Services*
    Regular Hours: Mon-Fri, 8 AM to 5 PM.

    Get a Quote
    https://wa.me/3474954959 +1-718-550-2779