The renovation process of a NYC apartment consists of planning and building phases. After determining the project cost, timelines are set. You must ensure that things progress according to the plan to avoid delays. Otherwise, the price will keep increasing, and so will the time. Also, extensive repairs and restorations often demand moving to a new accommodation. Hence, getting work done on time becomes even more necessary. At Zicklin Contracting, experienced and expert general contractors deliver results within the stipulated timeframe because of our resources and reach. We are here to help. Let’s understand approximately how much time is spent on planning and execution and why.

Planning phase (4-6 months)

Our apartment renovation contractors will discuss layout, flooring plan, renderings, selection and supply of materials, permits, etc. The planning phase of any standard renovation job can last from two to three months. These projects don’t include adding rooms or vast restructuring efforts. However, big projects entail deciding and documenting the entire space planning for DOB approvals. Clients can choose their favorite interior design, such as farmhouse, modern, or traditional. Based on the requirements, fixtures and finishes will be purchased for countertops, backsplashes, cabinets, vanities, paint, woodwork, plumbing, etc. You also see design renderings to get an idea of the final result. Once finalized, permits and design approvals are sought from the concerned authorities.

Construction phase (5-6 months)

The team at Zicklin ensures that all the major designs are approved by the governing bodies to help you enjoy transforming your beloved nest. The construction phase can start with demolition, depending on the specific needs. Flooring work often influences the success of apartment renovation. Some homeowners prefer refinishing the old floors, while others want to remove and replace them. Restoration services can even be provided if required.

background image

Furthermore, kitchens and bathrooms also form an integral part of the renovation. These spaces may include modifying plumbing and electric systems, reconfiguring floor plans, etc. So, if you consider a room-by-room scenario, this can be expected:

  • 3-4 weeks for bathroom renovation,
  • 4-6 weeks for kitchen renovation,
  • 2 weeks for new flooring in an average-sized apartment,
  • 3-4 months for full apartment renovation covering 2 bedrooms + 2bathrooms, kitchen, closets, flooring, and more.

FAQs

  • Is a large apartment renovation worth it in New York?

Yes. It allows you to rearrange the interior space, elevate your accommodation’s comfort and style, increase energy efficiency, and add value to your property.

  • How much of a budget do you need to renovate an apartment in NYC?

While the cost may vary depending on the nature of the renovation work, you can get new lighting, MDF cabinets, stock items, solid wood flooring, and a few other things for $100 to $200 per sq. ft. In the $200 to $300 per sq. ft. range, remodeling and many customization works can be done within the existing walls.

  • Why do renovation projects take so long to complete?

Extensive renovation requirements, complex designs, property types, and other factors can be held responsible for this.

  • Where can you stay during the renovation?

Some options include Airbnb, rented RVs, rental homes, hotel suites, and moving into a friend or family’s house.

Contact Us

Zicklin Contracting is known for completing 6,500+ projects and earning more than 200 happy customers. We communicate transparently and set realistic goals. If you need help revitalizing your NYC apartment, call our team from Monday to Friday between 8am to 5pm at +1-347-495-4959 or 718-550-2779. You can also drop us an email at zicklin@zicklincontracting.com. Our experts will get in touch with you at the earliest.

Contact us

Reach out to us

Call us
Call our team Mon-Fro 8am to 5pm.
Email us
Call our team Mon-Fro 8am to 5pm.






    Thank You!

    Your message was successfully submitted.

    We will contact you as soon as possible.

    background image
    OUR TRUSTED BRANDS
    Metroloft Logo
    Housing Authority Logo
    Housing Development Logo
    NACA Logo
    Santana Logo
    Altra Logo
    Logo
    Logo
    Recent Posts

    Latest Blog Posts

    See how we’ve helped our clients reimagine their homes and businesses with quality craftsmanship that will last for years to come.
    View All Posts
    background image
    OUR TRUSTED BRANDS
    Metroloft Logo
    Housing Authority Logo
    Housing Development Logo
    NACA Logo
    Santana Logo
    Altra Logo
    Logo
    Logo
    Contact us

    Reach out to us

    Call us
    Call our team Mon-Fro 8am to 5pm.
    Email us
    Call our team Mon-Fro 8am to 5pm.






      Thank You!

      Your message was successfully submitted.

      We will contact you as soon as possible.

      Background Image

      Ready to work together?

      It’s time to create your dream home in the “city that never sleeps”
      https://wa.me/3474954959 718-550-2779